Villiers Street
Full House Renovation
This 3 bedroom property was in a really poor condition and needed a full renovation. We first began work by stripping back all the walls to brick level, installed new electrical wiring throughout the property, plastered all the walls from top to bottom and installed new electrical points and switch boxes. The next stage was to fully insulate the loft to make the house energy efficient. The old kitchen was totally removed and replaced it with a brand new one with new fitted appliances, worktop, oven and hob, and air extractor. The heating system was replaced with a new energy efficient boiler as well as all the house radiators. We then fitted the property with a new bathroom with shower and tiled it throughout.
The final stage of the renovation was to paint and decorate the entire property and fit new carpets throughout.
The final stage of the renovation was to paint and decorate the entire property and fit new carpets throughout.
Location
Bell Green, Coventry
Building Type
Residential
Property Type
Terraced
Work Completed
Kitchen Installation, Bathroom Installation, Renovation
Share this page
Facebook
Twitter
LinkedIn
Tumblr
Telegram
WhatsApp
Looking to start a new project?
If you are looking to construct or renovate your property then you can speak to one of our specialists on 02476 680722 or send us a quotation request using the button link below.